How much excavation can be done in a day by Labour?

A typical dump truck is equipped with an open-box bed, which is hinged at the rear and equipped with hydraulic rams to lift the front, allowing the material in the bed to be deposited (“dumped”) on the ground behind the truck at the site of delivery.

How much excavation can be done in a day?

That means, a hydraulic excavator can excavate 242.4242 m3 of soil in one day.

How much Labour is required for excavating the soil of 1 cubic meter?

Or 1 cum of earthwork requires 1 labourer-day. So 100 cum of earthwork will require 100 labourer-days. If 10 labourers are employed it will take 100 labourer-days/10 labourer = 10 days.

How much can a man dig in a day?

12 persons can dig 324 cubic meters earth in a day.

How many yards can an excavator dig in a day?

1/2 Yard bucket, one cycle every 30 seconds = 120 cycles or 60 yards per hour X (6) productive hours = 360 yards excavated per day.

How do you calculate labor cost per cubic meter for concrete?

step 6, labour rate and charges :- consider one mason and 2 helper completed 1 cubic metre of concrete work in 8 hour, per mason rate INR 600 and per Helper rate 400,then cost of labour in concreting work = 600 +(2×400) = INR 1400. step 8, overhead expenses :- consider 2% overhead expenses,then 2% of 6555 = INR 131.

IT IS INTERESTING:  How much does it cost to buy a tow truck?

What is the quantity of excavation?

Excavation Calculation

Volume of Excavation =Length×Width×Depth. Where, ft3 is a total volume (cubic feet) and m3 is a cubic meter. length, breadth and depth in feet/inch.

How do you calculate trench excavation?

Determine the volume of the trench by using the formula: Volume = Width x Length x Depth. As an example, a trench 12 feet long with an average width of 2.3 feet and an average depth of 5 feet has a volume of (12 x 2.3 x 5) cubic feet.

How long does it take to dig a 6 foot hole?

It takes 0.07 hours (4.24 minutes) to dig 1.23 cubic yards of earth in stable soil. This means it takes 4.24 minutes to dig a 6 foot deep hole of 16 inches diameter.

How long would it take to dig a pool by hand?

An experienced excavation contractor with the proper equipment should be able to dig the hole for a typical pool in about 10 hours. Digging a hole for a larger than average pool or a pool in a location with rocky soil may be a two-day job.

How long does it take one person to dig a grave?

Sometimes the ground is frozen it can take two days. Sometimes your in a dense clay and it can take two to three days. The average person would not dig a grave by hand. But as much shovel work as I’ve seen by average people I would say the average person would dig a six foot grave in 4 and a half days.